The Cleanest Asphalt Production with the Best Control Technology in Vancouver Area, BC

    2330 Rogers Ave, Coquitlam, BC V3K 5X7
   
    plant@allroadsconstruction.com

To meet Metro Vancouver's strict environmental requirements and standards, ALL ROADS invested millions of dollars in a variety of systems to minimize emissions from all sources at our plant. Beyond its myriad environmental features, the plant also invested in technology to make its operations safer, easier and more efficient, including its maximum use of recycled asphalt pavement (RAP).

Skidded Asphalt Ultraplant Tour


This is currently the cleanest asphalt plant in Canada, on all levels, and we hereby challenge all of our competitors in the industry to rise to this new standard!


We produce, supply, and lay down our own asphalt!


The cost-saving advantage for your road paving projects.

In 2020 we built our very own state-of-the-art asphalt plant, which is currently the cleanest in Canada. Owning our asphalt production facility, and a full fleet of modern equipment, allows us to self-perform all your roadworks.

Most importantly, not having to deal with any 3rd party subcontractors or asphalt suppliers means we are competitively positioned to offer you great budget-friendly cost savings for your roadway construction and asphalt paving projects.

First day of operation
May 22, 2020

Gencor 300TPH Skidded Asphalt Ultraplant


Special features include:

  • Model 300 Skidded insulated Ulradrum with Ultra II – 100 gas fired burner
  • Ultrafoam GX2 - Warm Mix System
  • 3 - 200 Ton Premium Insulated Stationary Silos with Single Clam Gate
  • Top of Silo Bule Smoke Capture System
  • 6 Cold Feed Bins and 2 Recycle Bins
  • 2 - 25000 Gallon Indirect Fired AC Vertical Tanks with Top Mounted Dual Blade Agitators
  • 1 – 5000 Gallon Vertical Emulsion Tank
  • Model CFSP-151, 74,092 CFM Skidded Baghouse with Built-in Primary, 872-7'2" Bags15,059 Sq. Ft. of Cloth, 4.92:1 Air-to-Cloth Ratio c/w Baghouse Dust Removal System
  • 500BBL Stationary Mineral Silo with weigh pod and Slurry Dust Return Auger
  • Flue Gas Recirculation and Demister

Dennis Eby


Plant Manager

 
  d.eby@allroadsconstruction.com

Tony Genovese


Estimator / Asphalt Sales

 
  tony@allroadsconstruction.com

How Clean is Clean?


This video highlights ALL ROADS' efforts to lead the asphalt industry into a new and improved environmentally sustainable future. It challenges all other asphalt producers to improve their plants, to create more green spaces on their sites and to reduce their overall site emissions.

How it Was Built


Part 1: Ground Breaking

Part 2: Control Tower Lift

Part 3: First Day of Asphalt Production

Part 4: Construction Timelapse

MORE VIDEOS