City of Burnaby - Still Creek Drive at Eastbrook Parkway Roundabout
June 1, 2019
City Performance Evaluation of 93.74! This latest project by ALL Roads converted heavily congested T-intersection into a roundabout configuration without traffic lights for the City of Burnaby. It was interesting and challenging job site due to its very tight and limited working area for large construction equipment, as well as heavy traffic from 3 approaches that gets congested constantly.
One thing worth emphasizing about this contract is that we self-performed with our own crews internally at ALL Roads the entire scope of works, which included, excavating, underground work, pouring concrete for new curb and gutter installation, pavement rehabilitation, light way fills installation, catch basins, lawn basins, storm drainage, permanent and decorative stamped concrete, sidewalk building, and pavement markings.How it was constructed:
Click here to view this page online with additional details.
5645 199 St, Langley, BC V3A 1H9
Tel: 604.227.5400
Fax : 604.882.8224
Website: www.allroadsconstruction.com