Asphalt Resurfacing Highway 1 Burnaby Area, Hwy #1 Willingdon Ave. to Gaglardi Way (78 Lane KM)
October 30, 2020
This project includes resurfacing Highway 1 in both directions including the shoulders and on and off ramps of connecting interchanges. We utilized 3 new technologies for the 1st time in Canada: SmoothRide, Intelligent Compaction and a Notch Wedge Safety Joint to Maximize the EPS Bonus $ and provide a superior performing asphalt and ride.
Click here to view this page online with additional details.
5645 199 St, Langley, BC V3A 1H9
Tel: 604.227.5400
Fax : 604.882.8224
Website: www.allroadsconstruction.com