City of Burnaby - Still Creek Drive at Eastbrook Parkway Roundabout


Date Posted : June 1, 2019

Print| Email a Friend| Back


City Performance Evaluation of 93.74! This latest project by ALL Roads converted heavily congested T-intersection into a roundabout configuration without traffic lights for the City of Burnaby. It was interesting and challenging job site due to its very tight and limited working area for large construction equipment, as well as heavy traffic from 3 approaches that gets congested constantly.


Completed with City Performance Evaluation of 93.74


Project #: 191059

Contract Value: $1,242,239.00

Original Contract Value: $1,200,000.00
Explanation for Variance:

Status: Completed

Start Date: Spring 2019

Completion Date: Autumn 2019

Project Scope Highlights:

  • Upgrade T Intersection to New Roundabout Configuration
  • Roadway Excavation
  • Asphalt Milling
  • Granular Base Construction
  • Lightweight Fill, Misc. Concrete Works.
  • Storm Drainage Improvements
  • Asphalt Paving
  • Landscaping Improvements, Roadway Lighting

Project Associate(s):

  • Bayhill Contracting
  • Blue Pine Enterprises
  • Metro Testing

Client Information:

  • City of Burnaby
    Chris Whitlock, P. Eng.
    T: 604-294-7460

Project Supervisor Information:

  • McElhanney Consulting Services
    Doug D'Appolonia
    T: 604-596-0391

Project Engineers:

  • ISL Engineering and Land Services

    T: 604-629-2696

One thing worth emphasizing about this contract is that we self-performed with our own crews internally at ALL Roads the entire scope of works, which included, excavating, underground work, pouring concrete for new curb and gutter installation, pavement rehabilitation, light way fills installation, catch basins, lawn basins, storm drainage, permanent and decorative stamped concrete, sidewalk building, and pavement markings.

How it was constructed: