×
604.227.5400 Got Questions?
Road Construction Projects What's New Careers About Us Asphalt Plant Contact

Flyovers


All Roads Flyover is a short 30 seconds drone video series showing aerial views of our recently paved roadways, highways and municipal roads in Vancouver area, British Columbia. We never stop being amazed by how wonderful freshly paved asphalt looks from high above!
showing 1 to 12 of 13 on page 1
1  2  

All Roads Flyover: E Columbia St & Keary St, New Westminster

This is a cool split aerial view of our curb and concrete surface upgrade we are doing at Royal Columbian Hospital area where one side is recently completed and the other side is just getting started.
Project Details

All Roads Flyover: 72 Ave, 196 Street & Willowbrook Drive, Langley

Project Details

All Roads Flyover: Cottonwood Drive & Dewdney Trunk Road, Maple Ridge

Project Details

All Roads Flyover: Mariner Way at Como Lake, Coquitlam

Project Details

All Roads Flyover: United Boulevard, Coquitlam

Project Details

All Roads Flyover: 200 Street, 232 Street & 64 Avenue, Langley

Project Details

All Roads Flyover: River Road & Ferry Road, Delta

Project Details

All Roads Flyover: Anora Drive, Abbotsford

Project Details

All Roads Flyover: Highway 1, west of Port Mann Bridge, Coquitlam area

Project Details

All Roads Flyover: Highway 91 & Highway 17 Interchanges, south of Alex Fraser Bridge

Project Details

All Roads Flyover: Highway 1, south of Port Mann Bridge

This $16.7 million asphalt resurfacing project, covering Highway 1 from Port Mann Bridge to Golden Ears Way, was a design and build joint venture with the Ministry of Transportation and Infrastructure, British Columbia. We used various precision milling, concrete curbing and paving technologies, such as SmoothRide, PaveLink, Intelligent Compaction and a Notch Wedge Safety and GPS Grading & Curbing.
Project Details

All Roads Flyover: Still Creek Drive & Eastbrook Parkway, Burnaby

This roundabout was built for the City of Burnaby and the city's Performance Evaluation for us was 93.74! It converted heavily congested T-intersection near Costco into a roundabout configuration without traffic lights. It was interesting and challenging jobsite due to its very tight and limited working area for large construction equipment, as well as heavy traffic from 3 approaches that gets congested constantly.
Project Details
showing 1 to 12 of 13 on page 1
1  2